久久久成人动漫_91欧美视频在线_另类国产ts人妖高潮系列视频_国产精品成人一区_一区二区精品在线_99视频在线

Scan code consultation:
0755-2102 2109
Technology
Technology
Current location: Home Technology Ex tech
What is an explosion-proof certificate? Where can I handle it?

SINO Testing Services

| 2021-09-13|Return

With the increasing emphasis on safety production by the country, electrical equipment used in various chemical plants, oil stations, oil depots, grain and oil factories, coal mines and other places must pass the national standardGB3836Obtain the corresponding inspection and testing requirements for the series of explosion-proof standardsExplosion proof certificateOr coal safety certification.

todayZhongnuo TestingIntroduce the relevant knowledge of explosion-proof certification.

1、 Certification body

Enterprise customers can directly contact the certification agency to provide samples and information for certification, or they can also contactShenzhen Zhongnuo Testing Technology Co., LtdProxy handling. At present, there are more than ten institutions in China that are qualified to issue explosion-proof certificates, such as Nanyang CNEX, Shanghai NEPSI, Tianjin PCEC, Shenchuan Institute, Guangzhou Special Inspection Institute, Jiamusi Explosion proof Institute, etc.Zhongnuo TestingMaintain good and stable cooperative relationships with them.

2、 Data requirements:

1. Product drawing data: When applying for the explosion-proof certificate of intrinsic safety electrical equipment, enterprises should provide assembly drawings, circuit schematics, printed circuit board drawings, screen printing drawings, component material lists, and nameplate drawings. When a company applies for an explosion-proof certificate for non intrinsic safety electrical equipment, the technical data submitted for inspection should include the ability toZhongnuo TestingDrawings reflecting the explosion-proof performance of the sample (including assembly drawings and part drawings). When the overall drawing can clearly indicate the explosion-proof parameters and structure of the product, only the overall drawing can be submitted for inspection.

2. Technical documentation: including enterprise standards/technical requirements.The enterprise standards/technical requirements of the product should be written in the prescribed format, which should include not only the performance requirements of the product, but also relevant content related to explosion protection, such as basic parameters, explosion protection signs, environmental conditions for use, explosion protection performance requirements, relevant tests of explosion protection performance, and signs related to explosion protection.

3. Other information: For products with adhesives and sealants, the corresponding adhesive and sealant model names, performance specifications, and relevant process documents should be provided. For plasticsShellThe product should provide the material and corresponding performance documents of the plastic. Products with batteries are also availableZhongnuo TestingWe need to provide relevant specifications or testing reports for the battery.

3、 Sample requirements:

The prototype submitted by the enterprise for inspection should be consistent with the approved drawings and fully assembled, and the number of inspection units should meet the requirements. If there are special disassembly tools, they should be sent together. For sealed electrical equipment, one set of products with intact sealing and one set of products without sealing should be sent. Observation windowZhongnuo TestingAn additional 5 transparent pieces should be sent, at least 3 pieces. An additional 8 pieces, at least 5 pieces, of transparent components for the lighting fixtures should be provided. The rubber aging test should provide 3-5 35 × 15 × 6 rubber blocks. Two plastic sheets with a diameter of 150 × 60 are required for measuring the insulation resistance of plastic shells. If the size allows, the plastic casing can be directly measured. Generally, 1-2 finished products are required.

4、 Application method:

1. Free application: Enterprises can apply to certification agencies on their own, prepare relevant materials, assist in debugging prototypes, and modify non-standard parts of the materials. The process is relatively long, the overall cost is high, and it is time-consuming and labor-intensive.

2. Proxy application: Proxy application refers to a professional explosion-proof electrical technology service organization (such asZhongnuo Testing)The entire process of agency application, including data modification, prototype debugging, and progress coordination, is entrusted to the agency, ensuring good progress. The general processing cycle is 1-2 months, and the comprehensive cost is controllable, saving time and effort.


Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號
Service Hotline
18924609560
點擊這里給我發消息 1354407946
點擊這里給我發消息 1354407946
主站蜘蛛池模板: 一本一道久久久a久久久精品91 | 久久色伦理资源站 | av日韩在线免费观看 | 国产一级毛片高清视频 | 精品欧美一区二区精品久久 | 99欧美精品| 国产精品性夜天天视频 | 激情夜色 | 国产日韩三区 | 国产手机av在线 | 国产交换3p国产精品 | 毛片在哪里看 | 成人黄色免费 | av大全在线免费观看 | 欧美性生活视频免费 | 十级毛片 | 毛片国产 | 久久久精品视频免费看 | 意大利av在线 | 成人欧美日韩一区二区三区 | 欧美精品v国产精品v日韩精品 | 亚洲第一页中文字幕 | 久久久久成人精品免费播放 | 欧美激情999| 精品久久久久久国产 | 啊~用cao嗯力cao烂我视频 | 9191色| 欧美性受xxx黑人xyx性爽 | 91高清视频在线观看 | 国产日韩一区二区三区在线观看 | 欧美18一19sex性护士农村 | 久综合 | 国产精品午夜未成人免费观看 | 亚洲一区久久 | 成人免费乱码大片a毛片视频网站 | 日韩美香港a一级毛片 | 久久久新| 欧洲精品久久久 | 精品亚洲免费 | 成人视屏网站 | 99精品视频一区二区 |